Case Study 1
N9/N10 - Killcullen to Waterford Scheme

Large Scale Infrastructure Project

The survey was undertaken to provide the base information for the detailed design of the new 64km N9/N10 Waterford to Powerstown mainline Dual Carriageway.DigiTech 3D Land surveys was commisioned to establish the control network, produce 1/500 topographical survey of some 355ha of land,survey structure elevations and map 23 kms of streams and rivers. Survey was provided to the client in both MOSS & AutoCAD 2D & 3D formats.

Further work to the contract included setting out prior to commencement of construction

 
   